Wrong formula in the culvert flow rate calculation with OPTBUSE=1

This issue was created automatically from an original CUE issue, opened by Agnes Leroy. Further discussion may take place here.


The formulation for culverts should yield the same result as the siphon formulation in the specific case of the siphon.
This is the case with the option 2 for the culverts treatment but not with the option 1.
The test-case bridge (of TELEMAC-2D) is impacted.